Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

IEC 62337:2012 defines specific phases and milestones in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the 'completion-of-erection' milestone of the project and prior to the 'acceptance-of-the-plant' phase by the owner. Such activities need to be adapted for each type of process/plant concerned. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition is: the definition of the documents mentioned in this standard is in accordance with future IEC 62708.

Inbetriebnahme elektrischer und leittechnischer Systeme in der verfahrenstechnischen Industrie - Phasen und Meilensteine

Mise en service des systèmes électriques, de mesure et de commande dans l'industrie de transformation - Phases et jalons specifiques

La CEI 62337:2012 définit des phases et des jalons spécifiques (voir Figure 1) pour la mise en service des systèmes électriques, de mesure et de commande, utilisés dans l'industrie de transformation. Elle décrit, à titre d'exemple, les activités qui suivent le jalon 'achèvement du montage' du projet mais préalables à la phase 'de réception de l'ensemble industriel' par le maître d'ouvrage. Il est nécessaire d'adapter ces activités à chaque type de processus/ensemble industriel concerné. Cette deuxième édition annule et remplace la première édition parue en 2006. Cette édition constitue une révision technique. Les modifications principales par rapport à l'édition précédente: La définition des documents mentionnés dans la présente norme est conforme à la future CEI 62708.

Prevzemni postopki za električne, merilne in nadzorne sisteme v procesni industriji - Posamezne faze in mejniki (IEC 62337:2012)

Ta mednarodni standard določa posamezne faze in mejnike pri prevzemnih postopkih za električne, merilne in nadzorne sisteme v procesni industriji. S primeri opisuje dejavnosti po mejniku »dokončanje postavitve« projekta in pred fazo »sprejetje obrata« lastnika. Te dejavnosti je treba prilagoditi vsaki vrsti zadevnega procesa/obrata.

General Information

Status
Published
Publication Date
12-Apr-2012
Withdrawal Date
27-Mar-2015
Current Stage
6060 - Document made available - Publishing
Start Date
13-Apr-2012
Completion Date
13-Apr-2012

Relations

Buy Standard

Standard
EN 62337:2012
English language
39 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-junij-2012
1DGRPHãþD
SIST EN 62337:2007
3UHY]HPQLSRVWRSNL]DHOHNWULþQHPHULOQHLQQDG]RUQHVLVWHPHYSURFHVQL
LQGXVWULML3RVDPH]QHID]HLQPHMQLNL ,(&
Commissioning of electrical, instrumentation and control systems in the process industry
- Specific phases and milestones (IEC 62337:2012)
Inbetriebnahme elektrischer und leittechnischer Systeme in der verfahrenstechnischen
Industrie - Phasen und Meilensteine (IEC 62337:2012)
Mise en service des systèmes électriques, de mesure et de commande dans l'industrie
de transformation - Phases et jalons specifiques (CEI 62337:2012)
Ta slovenski standard je istoveten z: EN 62337:2012
ICS:
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 62337
NORME EUROPÉENNE
April 2012
EUROPÄISCHE NORM
ICS 25.040.40; 91.010; 91.040 Supersedes EN 62337:2007

English version
Commissioning of electrical, instrumentation and control systems in the
process industry -
Specific phases and milestones
(IEC 62337:2012)
Mise en service des systèmes électriques, Inbetriebnahme elektrischer und
de mesure et de commande dans leittechnischer Systeme in der
l'industrie de transformation - verfahrenstechnischen Industrie -
Phases et jalons specifiques Phasen und Meilensteine
(CEI 62337:2012) (IEC 62337:2012)

This European Standard was approved by CENELEC on 2012-03-28. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Management Centre: Avenue Marnix 17, B - 1000 Brussels

© 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 62337:2012 E
Foreword
The text of document 65E/221/FDIS, future edition 2 of IEC 62337, prepared by SC 65E, "Devices and
integration in enterprise systems", of IEC TC 65, "Industrial-process measurement, control and
automation" was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as
The following dates are fixed:
• latest date by which the document has (dop) 2012-12-28
to be implemented at national level by
publication of an identical national
standard or by endorsement
(dow) 2015-03-28
• latest date by which the national
standards conflicting with the
document have to be withdrawn
This document supersedes EN 62337:2007.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent
rights.
Endorsement notice
The text of the International Standard IEC 62337:2012 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:
IEC 61331 series NOTE  Harmonized in EN 61331 series.
IEC 61355-1 NOTE  Harmonized as EN 61355-1.

- 3 - EN 62337:2012
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year

IEC 62079 - Preparation of instructions - Structuring, EN 62079 -
content and presentation
IEC 62424 - Representation of process control engineering EN 62424 -
- Requests in P&I diagrams and data
exchange between P&ID tools and PCE-CAE
tools
1 1)
ISO 10628-2 ) - Diagrams for the chemical and petrochemical EN ISO 10628-2 -
industry -
Part 2: Graphical symbols
ANSI/ISA S7.0.01 - Quality Standard for Instrument Air - -

)At draft stage.
IEC 62337 ®
Edition 2.0 2012-02
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Commissioning of electrical, instrumentation and control systems in the

process industry – Specific phases and milestones

Mise en service des systèmes électriques, de mesure et de commande dans

l'industrie de transformation – Phases et jalons spécifiques

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX W
ICS 25.040.40; 91.010; 91.040; 91.140 ISBN 978-2-88912-913-3

– 2 – 62337 © IEC:2012
CONTENTS
FOREWORD . 3
INTRODUCTION . 5
1 Scope . 6
2 Normative references . 6
3 Terms and definition . 7
4 General preparations before acceptance of plant . 10
5 Completion of erection . 10
5.1 Mechanical checks and tests . 10
5.2 Procedure . 11
6 Precommissioning (mechanical completion) . 11
6.1 General . 11
6.2 Procedure . 11
7 Commissioning . 12
7.1 General . 12
7.2 Procedure . 12
7.3 Execution of performance test . 13
7.4 Evaluation and report of performance test . 14
8 Performance test and acceptance of plant . 15
8.1 General . 15
8.2 Conditions for commencement of performance test . 15
8.3 Execution of performance test . 16
8.4 Evaluation and report of performance test . 16
Annex A (informative) List of documents to be used for the precommissioning and
commissioning phase. 18
Annex B (informative) Description of precommissioning activities . 20
Annex C (informative) Mechanical completion certificate . 31
Annex D (informative) Description of commissioning activities . 32
Annex E (informative) Acceptance of plant certificate. 34
Annex F (informative) Project-specific items . 35
Bibliography . 36

Figure 1 – Definition of phases and milestones . 6

Table B.1 – General procedures . 20
Table B.2 – Specific procedures . 24
Table D.1 – Activities to be performed during the commissioning stage . 32
Table F.1 – Project-specific items to be discussed and agreed upon . 35

62337 © IEC:2012 – 3 –
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
COMMISSIONING OF ELECTRICAL, INSTRUMENTATION
AND CONTROL SYSTEMS IN THE PROCESS INDUSTRY –
SPECIFIC PHASES AND MILESTONES

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 62337 has been prepared by subcommittee 65E: Devices and
integration in enterprise systems of IEC technical committee 65: Industrial-process
measurement, control and a
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.