Representation of electrical & instrument objects in digital 3D plant models during engineering

IEC 63261:2024 provides requirements for the E&I objects of a digital 3D plant model, used in the engineering phase to design and construct a process plant and its instrumentation. It provides guidance how to model plants and their electrical and instrumentation equipment.
This document also specifies the content and the possible output of the 3D plant model at project milestones.
This document can be used by the contractual partners to agree upon the content of the 3D plant model to be delivered at specified milestones.
This document does not specify the transfer and format of digital 3D plant models.
This document does not specify definitions or instructions to equipment representations and details of elements in the 3D plant model not belonging to electrical and instrumentation domains.

Darstellung von elektrischen und prozessleittechnischen Komponenten in digitalen 3D Modellen während der Projektabwicklung

Représentation des objets électriques et d’instrumentation dans des modèles d’installation numériques 3d pendant la phase d’ingénierie

IEC 63261:2024 fournit des exigences pour les objets E & I d’un modèle d’installation numérique 3D, utilisé dans la phase d’ingénierie pour concevoir et construire une installation de traitement et son instrumentation. Elle fournit des recommandations sur la façon de modéliser les installations et leurs équipements électriques et d’instrumentation.
Le présent document spécifie également le contenu, ainsi que la sortie possible du modèle d’installation 3D aux jalons du projet.
Le présent document peut être utilisé par les partenaires contractuels pour convenir du contenu du modèle d’installation 3D à livrer à des jalons spécifiés.
Le présent document ne spécifie pas le transfert et le format des modèles d’installation numérique 3D.
Le présent document ne précise pas de définitions ou d’instructions pour les représentations d’équipements et les informations détaillées des éléments du modèle d’installation 3D qui ne relèvent pas des domaines électriques et d’instrumentation.

Predstavitev električnih in instrumentalnih objektov v digitalnih 3D modelih obratov med inženiringom

General Information

Status
Not Published
Public Enquiry End Date
26-Sep-2023
Current Stage
5020 - Formal vote (FV) (Adopted Project)
Start Date
15-May-2024
Due Date
03-Jul-2024
Completion Date
01-Jul-2024

Buy Standard

Draft
prEN IEC 63261:2023
English language
9 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
oSIST prEN IEC 63261:2023
01-september-2023
Predstavitev električnih in instrumentalnih objektov v digitalnih 3D modelih
obratov med inženiringom
Representation of electrical & instrument objects in digital 3D plant models during
engineering
Ta slovenski standard je istoveten z: prEN IEC 63261:2023
ICS:
29.020 Elektrotehnika na splošno Electrical engineering in
general
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
oSIST prEN IEC 63261:2023 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

oSIST prEN IEC 63261:2023
oSIST prEN IEC 63261:2023
65E/1021/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 63261 ED1
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2023-07-07 2023-09-29
SUPERSEDES DOCUMENTS:
65E/938/CD, 65E/1020/CC
IEC SC 65E : DEVICES AND INTEGRATION IN ENTERPRISE SYSTEMS
SECRETARIAT: SECRETARY:
United States of America Mr Donald (Bob) Lattimer
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:

TC 3
Other TC/SCs are requested to indicate their interest, if
any, in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some
Countries” clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is
the final stage for submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

TITLE:
Representation of electrical & instrument objects in digital 3D plant models during engineering

PROPOSED STABILITY DATE: 2026
NOTE FROM TC/SC OFFICERS:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

oSIST prEN IEC 63261:2023
– 2 – IEC CDV 63261  IEC:2023
CONTENTS
FOREWORD . 3
INTRODUCTION . 4
1 Scope . 5
2 Normative references . 5
3 Terms definitions and abbreviations . 6
3.1 Terms and definitions . 6
3.2 Abbreviations . 6
4 Requirements for E&I objects . 7
4.1 Properties . 7
4.2 Detail of design . 7
5 Content and timeline of the 3D plant model during engineering . 7
5.1 Content of the 3D plant model . 7
5.2 Timeline of the 3D plant model. 8
6 Model output . 9
7 Conformity . 9

oSIST prEN IEC 63261:2023
IEC CDV 63261  IEC:2023 – 3 –

INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
REPRESENTATION OF ELECTRICAL & INSTRUMENTATION OBJECTS IN
DIGITAL 3D PLANT MODELS DURING ENGINEERING

Engineering of process plant instrumentation – 3D model requirements

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their
preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
may participate in this preparatory work. International, governmental and non-governmental organizations liaising
with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence between
any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent
rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 63261 has been prepared by subcommittee SC65E Devices and
integration in enterprise systems, of IEC technical committee SC65E WG 13.

oSIST prEN IEC 63261:2023
– 4 – IEC CDV 63261  IEC:2023
INTRODUCTION
Engineering and construction in the process industries typically require the cooperation of
multiple companies.Due to economic reasons, special knowledge, special license, authorization
or simply capacity utilization the work is divided between partners. They will arrange their
cooperation for each individual project differently. This requires well defined divison of work
and responsibilities across the different phases of project execution.
Efficient engineering of a digital 3D plant model requires highly sophisticated tools for the
different needs of the involved work processes and departments. By nature of the plant model
all engineering disciplines meet in the model and need clear definitions of the content and
interfaces.
Digital 3D plant models play an important part in electrical and instrumentation engineering to
create technical drawings and avoid clashes between the elements provided by different
engineering disciplines.
The first aim of this standard is to define the level of details of electrical and instrumentation
equipment representations placed in the 3D plant model. It specifies minimum requirements at
the different maturity grades of the model for each equipment, its related metadata and reports
retrieved from the 3D plant model.
The second aim of this document is to define a timeline and project milestones with the
associated level of detail for the incorporation of electrical and instrumentation equipment into
the 3D plant model.
This document aims at avoiding misunderstandings and erroneous design work in order to
reduce additional corrective works and expenses for clarification.

oSIST prEN IEC 63261:2023
IEC CDV 63261  IEC:2023 – 5 –
REPRESENTATION OF ELECTRICAL & INSTRUMENTATION OBJECTS IN
DIGITAL 3D PLANT MODELS DURING ENGINEERING–

Engineering of process plant instrumentation – 3D model requirements

1 Scope
This document provides requirements for the E&I objects of a digital 3D plant model, used in
the engineering phase to design and construct a process plant and its instrumentation. It
provides guidance how to model plants and their electrical and instrumentation equipment.
This document also specifies the content and the possible output of the 3D plant model at
project milestones.
This document can be used by the contractual partners to agree upon the content
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.